China-CCC-Certification

:

Implementation-Rules

-

Helmets for Motorcycle Users-Implementation rules for ccc compulsory certification of helmets

CCC mark,CCC certification,china ccc certification application,ccc china compulsory certification applying
CCC mark,CCC certification,china ccc certification application,ccc china compulsory certification applying
Make CCC As HomepageMake CCC As Homepage
Add Current Page To FavoriteAdd Current Page To Favorite
The first global professional service organization of CCC China Compulsory CertificationContact Us

Helmets for Motorcycle Users-Implementation rules for ccc compulsory certification of helmets

Implementation rules for ccc compulsory certification of helmets

Helmets for Motorcycle Users

Announced on April 1, 2002 Implemented on May 1, 2002

Issued by Certification and Accreditation Administration of People’s Republic of China

1 Scope
This document applies to the products of motorcycle helmet
2 Definition
The definition of motorcycle helmet sees GB 811-1998 Helmets for motorcycle users
3 Certification model
Type testing + Initial inspection in the factory + Follow-up inspection
4 General requirements for certification
4.1 Application for certification
4.1.1 Classification of application unit
The products made by different factories should not be in the same unit.
The different configurations of the products should not be in the same unit.
The products made of different materials should not be in the same unit.
The different sizes of the products should not be in the same unit.
4.1.2 Application documents
The documents of certification application see the Appendix 1.
4.2 Type testing
4.2.1 The rules of sample delivery
The sample should be delivered according to certification application unit .
4.2.2 Sample delivery
4.2.2.1 The sample for type testing should be delivered by the applicant.
4.2.2.2 Six samples should be delivered for each certification application unit.
4.2.2.3 Handles of the tested samples and/or the relating documents
The tested samples and/or the relating documents should be handled in appropriate ways after type testing.
4.2.3 The references and items for type testing
Test items see Appendix 2.
Test should refer to the standard of GB 811-1998 Helmets for motorcycle users
4.3 Initial inspection in the factory
4.3.1 Contents of inspection
4.3.1.1 Assessment of factory's quality assurance ability
The assessment should be carried out according to the Requirements for Factory's Quality Assurance Ability (see the Aappendix 3).
4.3.1.2 Check of consistency of the product
a) The labels of applied products
b) The configuration and the characteristic items of applied products
c) Sample test for applied products . If necessary, the sample should be delivered to test in certified test laboratory.
4.3.1.3 Inspection scope
The processing sites should be covered in inspection of factory quality assurance ability . All the products to be certified should be covered in check of consistency of the products.
4.3.2 The opportunity of inspection
Normally, initial inspection in the factory should be carried out after the sample had passed the type testing. The type testing and inspection in the factory can be carried out at same time, if necessary.
The duration of inspection in the factory should be determined by the amounts of application units of products that to be certified and with the consideration of the scale of the factory. It normally takeS about 2 to 6 persion day for each factory.
4.4 Evaluation of certification results and approval of certification
Evaluation of type testing result will be made by the certified test laboratry. Evaluation of initial factory inspection will be made by the team of inspection in the factory. Approval of certification will be made by certification body.
4.4.1 Evaluation of type testing result
If the results of all the test items meet the requirements of the standard, the result of type testing can be regarded as “pass”. If a few defects of the test items are found but easily be improved, it is allowed to deliver samples again and retest them. If any defect appears again in the retest, the result of type test will be “Fail”.
4.4.2 Evaluation of initial factory inspection
4.4.2.1 If there is not any non-conformity found during whole inspection, the initial inspection of the factory is regarded as “Pass”.
4.4.2.2 If there are slight non-conformities found which do not adversely affect the safety standard for certification product, the factory shall take corrective actions within specified time. If the actions are regarded as effective by inspection team, the initial inspection in the factory is regarded as “Pass”.
4.4.2.3 If there are serious non-conformities and/or the factory does not have the ability to produce the products, which conform to relevant standards, the inspection will then be terminated.
4.4.3 Approval of certification
Both type testing and factory inspection are evaluated as “Pass”, the certification body will issue certificate (one certificate for each application unit).
4.4.4 Time frame
The time frame of certification indicates the actual working days from the acceptance of application till the issuance of the certificates. It includes the time of type testing, reports submission after factory inspection, evaluation of certification results and approval of certification, preparing of the certificates, etc.
Type testing takes 20 working days.
Normally, the inspection reports should be submitted within 5 working days.
Evaluating certification results, approving the certification and preparing the certificates should normally be completed within 5 working days.
4.5 Follow-up inspection
4.5.1 Frequency of follow-up inspection
4.5.1.1 The follow-up inspection shall normally be started at 12 months after the certificate being granted and should be carried out at least once a year
4.5.1.2 The frequency of follow-up inspection should be increased in any of the following cases:
a) The certified product has serious quality problem, its safety and quality are accused by clients, and these had been verified to be the responsibility of certificate holder.
b) The certification body doubts the conformity of the certified products with the relevant standards with sufficient reasons.
c) Sufficient information indicates that the conformity or the consistency of certified products might be varied due to the changes in organization structure, production condition and the quality control system of the manufacturer and /or factories.
4.5.2 Contents of the follow-up inspection
4.5.2.1 Re-assessment of the factory quality assurance ability
The re-assessment scope of the factory quality assurance ability should cover all the contents of Appendix 3 within 4 years since the certificate has been granted. The re-assessment of each factory normally takes 1 to 2 person day.
From the 5th year, the factory quality assurance ability should be assessed completely according to Appendix 3. The contents and time frame of inspection will be the same as that of the initial inspection in the factory.
4.5.2.2 Check of consistency of product
The check should be carried out on the spot according to articles 4.3.1.2 and 4.5.1.1 of the rules after the certificate being granted.
4.5.3 Handling of the follow-up inspection results
The certification can be kept validity and the certification marks can be continuously used upon favorable inspection results. If any non-conformity were found in the follow-up inspection, the corrective actions should be taken within one month. Otherwise, the certificates will be withdrawn, the certification marks will be stopped using, and the relevant results will be announced.
5 The Certificate
5.1 The validity of the certificate
The validity of the certificate depends on the follow-up inspection.(The certificate of the products covered by this Rule does not indicate specific expiry date.)
5.2 Changes of the products covered by the certificate
For changes of the range of products covered by the same unit of certified products, the certificate holder shall first submit application . The certification body should check the consistency of the changed products against the certified products and confirm the applicability of the original certification results to the changed products and carry out the additional test or inspection based on the differences.After approval, either a separate certificate can be issued or the original certificate can be updated at the request of the certificate holder. 5.3 Suspension, cancellation, and withdrawal of the certificates
If the certification holder violates the rules and other regulations for compulsory certification, the certificate will be suspended, canceled and withdrawn, and the certificate mark will be stopped using according to the Regulation for Compulsory Product Certification.
6 Use of compulsory product certification mark
The certificate holder shall follow the Regulations for Compulsory Product Certification Mark.
6.1 The mark type permitted to use
6.2 Application of the mark
The certifacate holder should apply the certification mark on an exposed location on the motorcycle helmet products with affixing standard-size marks.
7 Charge The certification shall be charged by the certification body according to the national statutory structural fee chart.

APPENDIX 1
INFORMATION DOCUMENT OF MOTORCYCLE helmet FORCOMPULSORY CERTIFICATION

1.The technical conditions of manufacturer related to the test items of the product certification (National standards,factory standards, technical conditions,etc.) 2.Description of product configuration and its character
2.1Description of helmet configuration and its character sees table 1.
2.2Appearance pictures(each for front and lateral view) 3.Test reports relating to the product certification
4.General information of the manufacturer
4.1 The copies of registered product licence and trade mark's certifacte
4.2 Production condition (annual output and production history of the applied products)
4.3 Registration form of key supplied components and row materials (including name, model, size,supplier, test items)
4.4 Registration form of the manufacturer’s main testing devices and equipments (including name, model, specification, number, accuracy and period of calibration)
4.5the contents of quality control system and organization block(diagram)
5.User's Guide or manual book
6. Others

Table 1 Description of helmet configuration and its character

Factory

Trade mark

Model

Configuration

Material

Size

Type

APPENDIX 2

Test items

When test is carried out according to the standard GB 811-1998 Helmets for motorcycle users,the test items ,requirements and methods see table 2.

Table 2 Test items ,requirements and methods

No.

Test items

Requirements No.

Methods No.

1

Configuration and size

45.1.15.1.25.1.3

6.2

2

Extent of protection

5.2.1

6.2

3

Mass

5.2.2

6.3

4

Peripheral vision

5.2.3

6.4

5

Goggle

5.2.4

6.5

6

Strenth of retention

5.2.5

6.6

7

attenuation of impact energy

5.2.6

6.7

8

Penetrition

5.2.7

6.8

9

Marks or labels

8.1

View

Note

In No.7 item, every two helmets will be tested under high temperaturelow temperature and water immersion .

APPENDIX 3
Compulsory Product Certification Requirements for Factory’s Quality Assurance Ability
Manufacturer shall meet the requirements for factory’s quality assurance ability specified in this document, in order to ensure that all certified products are identical with the sample(s) against which the type test was approved.
1. Responsibilities and Resources
1.1 Responsibility
Manufacturer shall define the responsibilities and inter-relations of all the personnel involved in quality activities. And manufacture should appoint a management representative for quality, who, irrespective of other responsibilities, shall be responsible to:
a)ensuring that quality system, which meets the requirements of this document, is established, implemented and maintained.
b)ensuring that the products with the compulsory certification mark are produced in conformity with the standards to which they were certified.
c)establishing documented procedures to ensure that compulsory certification marks are kept and used appropriately.
d)establishing documented procedure to ensure that the compulsory certification mark is not affixed on any non-conforming product or changed product that was not notified to certification body.
The management representative for quality shall be competent to perform the work.
1.2 Resources
Factory shall be equipped with necessary production facility and testing equipment in order to consistently manufacture the products in conformity with relevant standards. In addition, and factory shall provide relevant human resources, to ensure that personnel performing work affecting product quality is competent, and shall establish and maintain necessary environment suitable for manufacturing, testing and inspection, storage etc.
2. Documents and Records
2.1 Manufacturer shall establish and maintain documented quality plan or relevant documents for certified products, and the documents need to ensure that related processes to product quality are operated and controlled effectively. Quality plan shall define the objective of product design, realization process, test and related resource, as well as the requirements for changes (i.e. specification, processing, critical components etc.) to certified products, use and management of marks.
Standard or specification which the design is based on, as one essential part of quality plan, shall be more strict than the requirements specified in this Rules.
2.2 Manufacturer shall establish and maintain documented procedure to control the documents required in this document, to ensure that
a)all documents issued and changed shall be approved by authorized personnel prior to issue and change.
b)changes and current revision status of documents are identified to prevent unintended use of obsolete documents.
c)relevant valid versions of applicable documents are available at points of use.
2.3 Manufacturer shall establish and maintain documented procedures to define the controls for the identification, storage, protection and disposition of records. Records shall be legible, integral to provide evidence of product conformity to requirements.
Records shall be retained for an appropriate period.
3. Purchasing and receiving Inspection
3.1 Control of Supplier
Manufacturer shall establish the procedures that define the criteria for selection, evaluation and routine supervision of supplier, which provide critical components and material, to ensure the supplier has ability to provide the critical components and material in accordance with requirements.
Records of the evaluations and routine supervision shall be maintained.
3.2 Inspection/Verification for Critical Components and Material
Factory shall establish and maintain procedures of inspection or verification for purchased critical components and material, and procedure of periodic verification inspection, to ensure that critical components and material meet specified certification requirements.
Inspection for purchased critical components and material may be carried out at the factory or supplier’s premises. Where inspection is performed at supplier’s premise, Manufacturer shall specify the intended inspection requirements to supplier.
Manufacturer shall maintain records of inspection or verification of critical components, verification inspection records, evidence of conformity and relevant inspection data, etc.
4. Process Control and Inspection
4.1 Manufacturer shall identify critical production processes and arrange operators with appropriate qualification at the processes. Where product quality can not be guaranteed when no operating document, appropriate operating instructions shall be prepared to make production processes under control.
4.2 Where environment condition is required, factory shall meet the requirements.
4.3 Manufacturer shall monitor and control appropriate process parameters and product characteristics, as applicable.
4.4 Manufacturer shall establish and maintain maintenance procedure for the manufacturing equipment.
4.5 Production shall be inspected at appropriate stages of manufacture to ensure that products, components and parts are in accordance with the certification approved sample.
5. Routine Tests and Verification Tests
Factory shall establish and maintain documented routine tests and verification tests procedures to verify and demonstrate that products are in compliance with relevant requirements. The procedures shall include test items, contents, method, acceptance criteria etc. Test records shall be maintained. Routine tests and verification tests shall meet the requirements specified in relevant product certification implementation rule.
Routine tests are performed on 100% of production and are normally carried out at the final stage of production. Normally no further operations, except for labeling and packing, may be carried out after these tests.
Verification tests are tests on samples taken randomly in order to verify and demonstrate that products consistently meet standard requirements.
6. Inspection and Test Equipment
The equipment used for inspection and test must be regularly calibrated and checked for correct operation, and meet inspection and test capacity requirements.
Manufacture should stipulate the operation rules of the inspection and test equipment. Testing personnel should follow the rules and use the equipment correctly.
6.1 Calibration
Inspection and test equipment used for determining the conformity of the products being manufactured shall be calibrated on a regular basis. All calibrations undertaken on such equipment must be traceable to national or international standards. For in-house calibration, the method, acceptance criteria, calibration interval etc. shall be documented. Calibration status of the equipment shall be easily identified by operator and personnel in-charge.
Calibration records shall be maintained appropriately.
6.2 Functional Check
The Functional check to the equipment used for routine tests and verification tests shall be undertaken on a daily basis. When functional check is found to be not satisfied with specified requirements, arrangements shall allow previous product to be traced, retrieved and re-tested if necessary. Operator shall be instructed on what action is to be taken if a functional test is found to be unsatisfactory.
The results of functional check and all subsequent corrective action taken must be recorded.
7. Control of Non-conforming Product
Manufacturer shall establish procedure of control of non-conforming product, which shall includes identification method, segregation, disposal, corrective action and preventive action. Repaired and reworked product shall be re-tested. Records of repairing for critical components and parts and disposal of non-conforming product shall be maintained.
8. Internal Audit
Internal audit procedures shall be established and documented to ensure that quality system is implemented effectively and certified products are complied with specific requirements. The results of internal audit shall be maintained.
Factory shall keep records of all complaints, especially to a product’s non-compliance with requirements of relevant standard, and make these complaints as one of input of internal audit.
Corrective and preventive action shall be taken to non-conformities and records shall be maintained.
9. Changes to Certified Product
Any constructional Changes from original sample for Type Testing should be controlled so as to make certified products consistently be in conformity with relevant standard.
Manufacturer shall establish procedures to monitor changes of the critical component, material, construction and factors that may affect compliance with relevant standard. The changes on certified products must be notified to the certification body for authorization, prior to their implementation.
10. Packing, Handling and Storage
Finished products shall be packaged, stored and handled in such a way as to ensure that they will continue to comply with the applicable standards.

The Process of CCC Certification For New Application(http://china-ccc-certification.com/170.html)

Keywords Search


Tel 0086-21-51095580-805; Fax 0086-21-51095580-807; E-mail cccwto#163.com
Shanghai Compulsory Certification Information & Technology Co.,Ltd. © All Rights Reserved