China-CCC-Certification

:

Implementation-Rules

-

IMPLEMENTATION RULES-Artificial Heart-Lung Machine Water Heating/Cooling System

CCC mark,CCC certification,china ccc certification application,ccc china compulsory certification applying
CCC mark,CCC certification,china ccc certification application,ccc china compulsory certification applying
Make CCC As HomepageMake CCC As Homepage
Add Current Page To FavoriteAdd Current Page To Favorite
The first global professional service organization of CCC China Compulsory CertificationContact Us

IMPLEMENTATION RULES-Artificial Heart-Lung Machine Water Heating/Cooling System

Ref. No.CNCA-08C-042:2001


IMPLEMENTATION RULES FOR COMPULSORY CERTIFICATION OF MEDICAL DEVICE
Artificial Heart-Lung Machine
Water Heating/Cooling System
Announced on Dec 7,2001 Implemented on May 1,2002
Certification and Accreditation Administration Of People's Republic of China


1. Scope
This document applies to artificial heart-lung machine—water heating and cooling system, which is used for the medical facilities during open heart surgery, regulating blood temperature.
2. Certification Model
Type Testing + Initial Factory Inspection + Follow up Surveillance
3. General Requirements for Certification
3.1 Application for certification(http://china-ccc-certification.com/171.html)
3.1.1 Defining application for certification
Principally, same products of a same factory but different producing site shall be applied separately when making application for certification.
3.1.2 Application documents
Applicant shall submit formal application and related documents including:
1) Instruction for use, technical description and service manual in Chinese;
2) Assembly drawing of product, electrical diagram, electrical wiring drawing and installation diagram of components;
3) Test report of safety test for product (including test standard and test method);
4) History of factory, productive capacity of applying product;
5) List of main safety components with name, type, specification, supplier and inspection items before stocking.
6) Other documents.
3.2 Type testing
3.2.1 Sample delivery for type testing
3.2.1.1 The principles of supplying samples for type testing
The samples supplied for type testing shall be selected from representative samples.
3.2.1.2 Samples quantity
The applicants shall take responsibility of sample delivery for type testing in accordance with the requirements of the certification body and be responsible for them.
The quantity of samples shall be 1 and components tested accompanying the appliances shall be according to the requirements of appendix 1.
3.2.1.3 Handle of samples and relating documents after type testing
The samples tested and/or the relating documents should be handled in appropriate ways after type testing.
3.2.2 Standards, items and methods of the type testing
3.2.2.1 Test standards
YY91047 Artificial heart-lung machine Water heating/cooling system
GB9706.1 Medical electrical equipment-Part 1: General requirements for safety
3.2.2.2 Test items
The type testing shall be carried out according to total items specified in GB9706.1.
3.2.2.3 Test methods
The type testing for artificial hear-lung machine-water heating/cooling system shall be carried out according to GB9706.1.
3.3 Initial inspection of the factory
3.3.1 Contents of the inspection
3.3.1.1 Assessment of factory quality assurance ability
The inspector assigned by the certification body shall carry out the factory quality assurance capability assessment according to the Compulsory Product Certification Requirements for Factory's Quality Assurance Ability (see appendix 2) and the additional inspection requirements stipulated by CNCA.
3.3.1.2 Check of consistency of the product
The inspection for consistency of the products applying for certification shall be implemented on the site of production during the factory inspection.
If the certification referred to the varied type /model of products, each type shall be sampled 1. Key items to be checked are as follows:
1) The nameplates and marks of products to be certified shall be identical with those indicated in the type test reports.
2) The product(s) construction referred to safety function shall be identical to those of the samples for the type test reports.
3)The safety critical parts shall be identical with those declared in type test and confirmed by the certification body.
The certified product shall be sampled for test by inspector, if there is a question in the inspection results. The sample shall be chosen from the qualified product. The sample, determined by inspector according to the actual situation, would be a complete unit. For product, quantity is 1; for safety components, see appendix 1. Samples shall be tested by the designated inspection body. No inspection organization under the factory shall be entrusted to do the test. The test items shall be determined by the certification body according to actual situation.
3.3.2 Inspection scope
All the products to be certified and processing premises shall be covered for inspection of factory quality assurance ability and of consistency of the products.
3.3.3 Time for initial factory inspection
Normally, the initial inspection should be implemented after the sample has passed the type testing. The type testing and factory inspection can be implemented at the same time in special cases.
The duration of factory inspection shall be determined by the amounts of application units of products to be certified and with the consideration of the scale of the factory. It will normally take about 4 to 6 man-day for each processing premises.
3.4 Evaluation of the certification results and approval of certification
3.4.1 Evaluation of the certification results
3.4.1.1 Evaluation of the type testing results
If there are some items unqualified but easy to correct, the corrective action are allowed. When all the test items conform to the standard, the result is “pass”.
Certification shall be terminated if the safety test result is “fail”.
3.4.1.2 Evaluation for the Initial factory inspection.
The results can be divided into 3 levels:
1) If no nonconformity is found during the inspection, certificate is recommended to award to the manufacturer by the certification body.
2) If slight nonconformity is found and the nonconformity has no adversely influence on the product to conform to the safety standard, the manufacturer should take corrective action within 3 months as specified. Only after being confirmed by the inspection group, certificate is recommended to issue to the manufacturer by the certification body.
3) If severe nonconformity is found or the manufacturer doesn't have the quality assurance ability to meet the certification requirements, inspection can be terminated.
3.4.2 Approval of the certification results
When the results of type testing and factory inspection for the products are qualified and proved by the certification body, certification can be issued. The application of the certificates shall comply with the requirements of Administration of Compulsory Products Certification.
3.4.3 Time frame for certification
The time frame for certification is the working days occurring from the acceptance of complete application till issuing certificates, which includes the time of type testing, factory inspection, evaluation of certification results and approval of certificates and preparing the certificates.
The time frame for type testing(including making test reports) of appliance normally should take 45 working days.
The time frame for submitting the test report shall be within 5 working days.
The time frame for evaluating on certification results, approving and typing certificates should not exceed 5 working days.
3.5 Follow up surveillance
3.5.1 The frequency of the follow up surveillance
3.5.1.1 The follow up surveillance shall be implemented once at least every year after getting the certificates for 12 months.
3.5.1.2 The frequency of surveillance should be increased if occurring any of the following case:
1) The quality of the certified product has seriously problems, or receiving the appeal from the client and checking concludes that the holder of the certificate shall be responsible for it.
2) The certification body queries the conformity of the certified product against the requirements of safety standards with sufficient reasons.
3) There is sufficient information that the conformity or the consistency of the certified products would be affected since the changes of organization system, production condition and the quality system of the manufacturers.
3.5.2 Contents of the follow up inspection
3.5.2.1 Model of the inspection
Routine factory inspection + consistency inspection
3.5.2.2 Routine factory inspection for the quality assurance capability of the factory
The routine inspection for factory quality assurance capability shall be implemented within 4 years after attaining the certificate and the scope shall cover the document of Requirements of Factory Quality Assurance Capability. The time frame for the routine inspection should take 1 to 2 person/day for each on spot.
There shall be an overall inspection to the factory in the 5th year of attaining the certificate according to the document of Requirements of Factory Quality Assurance Capability . The scope and time shall be in consistent with the initial factory inspection.
The span for an overall inspection period shall be of 4 years.
3.5.2.3 Check of consistency of the products
The consistency inspection for the applying certified product shall be implemented on the site of production within 4 years after getting the certificate.
The inspection or testing on the site shall be carried out as the following list besides the scope of inspection in this provision of 3.3.1.2 of the Implementation Rules.
a .The items refer to the doubt about the structure consistency inspection.
b. The items refer to critical parts is unconformity to the critical parts used for certified testing.
c. The safety items difficult to judge without testing or mainly and easily changed such as:
1) Marking (according to Clause 6.1 of GB9706.1)
2) Protective earthling (according to Chapter 18 of GB9706.1, if applicable)
3) Leakage current (according to Chapter 19 of GB9706.1. includes Earth leakage current, Enclosure leakage current and Condition Patient leakage current.)
4) Dielectric strength (according to Chapter 20 of GB9706.1)
Inspector may implement sample test on the product if suspect of the consistency and safety of the product after inspection.
Samples shall be provided according to the unit in the 5th year of certification. Principally one unit shall be sampled 1 for test. and the test shall be implemented by appointed testing bodies according to the requirements of 3.2 in this document. If no change on the product, the certification body shall have sample test or information inspection according to specific situation.
3.5.3 Sampling test for follow up surveillance
Sampling test shall be implemented to the certified products by the appointed testing bodies when necessary. Each certified product shall be sampled 1 for test .Concrete test items can be carried out according to 3.2.2.1 of this document.
Concrete methods and requirements for sampling shall be carried out according to 3.2.2.1 of the Implementation Rules. The test items specified in the standards for certification may be applied for the test items of surveillance inspection.
Critical testing items are as follows according to GB9706.1:
1) Identification, marking and document 2) Limitation of voltage and/or energy 3) Enclosures and protective covers
4) Protective earthing
5) Continuous leakage current
6) Dielectric strength
7) Mechanical strength
8) Surface, corners and edges
9) Protective earth terminal and connection
The certification body may carry out the tests by choosing test items according to specific situation.
3.5.4 Evaluation of follow-up inspection results
The certificates can be retained and the certification marks can be continuously used upon favorable inspection results. If there is any non-conformities found in the follow-up inspection, the corrective actions shall be taken within three months. Otherwise, the certificates will be withdrawn, the certification marks will be stopped using, and the relevant results will be announced.
4. Maintenance and modification of the certificates
4.1 Maintenance of the certificate
The Implementation Rules specifies the conformity certificates without covering the closing date of the certificates. The term of validity of the certificates depends on the surveillance inspection by the certification body at regular intervals for maintenance of it.
4.2 Modification for covering product of certificate(http://china-ccc-certification.com/225.html)
4.2.1 Procedure for change
If holders of the certificates require changing the scale of the products which are of the same unite as the certified ones, they shall make application first. The certification body shall check the consistency of the newly applied products against the certified ones and confirm the validity of the original certification against the newly applied products and carry out supplementary tests or inspection for the differences .  After being confirmed that the extension qualified by the certification body, new certification or supplement of the certification can be issued to the holder. Or maintain the original certification or keep as technical information.
4.2.2 The requirements of sample product
The holders of the certificates shall firstly submit the technical materials related to the extending products and, as necessary, supply 1 sample according to the requirements of provision of 3.2 of the Implementation Rules for checking by the certification body. The items for checking shall be specified by the certification body for the samples required testing as check.
5. Use of compulsory certification mark
The certificate holder shall follow the Regulation for Compulsory Product Certification Mark.
5.1 Derivations of Certification mark
The products listed in the Rule shall not be allowed to use any derivation of certification.
5.2 Design of the mark that allowed to use
When certification concerns with safety only, the mark shall be:
5.3 Application of the mark
Standard specification mark(http://china-ccc-certification.com/148.html) shall be used.
5.4 Location of the marks
The certification marks shall be used on the products near the nameplate.
6. Suspension, cancellation and withdrawal of the certificates
Should the holder(s) of the certificate(s) violate the Special Rules and other requirements of compulsory product certification, the certificates shall be suspended, cancelled and withdrawn in accordance with the requirements of the document Administration of Compulsory Product Certification.
7. Charge
The certification shall be charged by the certification body according to the national statutory structural fee chart.

Other documents which are relative to CCC certification for Artificial Heart-Lung Machine Water Heating/Cooling System

1. CCC Certification New Application Form:
Word file: http://china-ccc-certification.com/UploadFiles/CCC-Product-Safety-Certification-Intent-Application.doc
Pdf file: http://china-ccc-certification.com/UploadFiles/Product-Safety-Certification-Intent-Application.pdf

2. CCC Certification Re-application Form:
Word file: http://cccwto.com/UploadFiles/2011225164829_115.doc

3. CCC Certification Alternation Application Form:
Word file: http://china-ccc-certification.com/UploadFiles/CCC-Alternation-Application-Form.doc
Pdf file: http://china-ccc-certification.com/UploadFiles/CCC-Alternation-Application-Form.pdf

4. Purchase CCC Mark Application Form:
Word file: http://china-ccc-certification.com/UploadFiles/Purchase-CCC-Mark-Purchase-CCC-Mark-Application-Form.doc
Pdf file: http://china-ccc-certification.com/UploadFiles/Purchase-CCC-Mark-Purchase-CCC-Mark-Application-Form.pdf

5. Print Impress CCC Mark Application Form:
Word file: http://china-ccc-certification.com/UploadFiles/Print-Impress-CCC-Mark-Print-Impress-CCC-Mark-Application-Form.doc
Pdf file: http://china-ccc-certification.com/UploadFiles/Print-Impress-CCC-Mark-Print-Impress-CCC-Mark-Application-Form.pdf

Keywords Search


Tel 0086-21-51095580-805; Fax 0086-21-51095580-807; E-mail cccwto#163.com
Shanghai Compulsory Certification Information & Technology Co.,Ltd. © All Rights Reserved